- Innov8 AI
- Posts
- Gemini 3.0 Pro Leak ആയി...
Gemini 3.0 Pro Leak ആയി...
PLUS: Microsoft AI Image Generator? | L8R by Innov8


Google 3.0 aanippo charcha vishayam..
Athinte korach leaks erangitund..
oru single html filil macos clone cheyyunu..
Windows clone cheyunnu..
angane koree..
Oct 22 nu release aakumenn rumours und..
Ithu mathram alla vereyum kore interesting AI updates und..
I’m Alex, Welcome to L8R by Innov8.
Let’s DIVE DEEP 👨🏫👇
In today’s post:
Gemini 3.0 Pro: Just a Rumour (For Now)
Microsoft MAI-Image-1: The New AI Image Star
OpenAI + Broadcom: Chips Without Nvidia?
Google’s $15B AI Hub in Visakhapatnam
Gemini 3.0 Pro: Just a Rumour (For Now)

Everyone’s talking about Gemini 3.0 but Google hasn’t said a word.
A mysterious leaked calendar screenshot is all we have, hinting at a 22 October reveal. But even that is unconfirmed.
No official announcement from Google as of now.
Rumours say Gemini 3 might feature better memory, smarter task handling, and video understanding but nothing is confirmed.
📰 What’s New?
An unverified social media leak shows a possible “marketing milestone” for Gemini 3.0 on 22 Oct 2025. TechRadar and 9to5Google both covered it — but warned readers not to trust it fully.
But..
Some guys at X got access -
🚨 Gemini 3.0 Pro - ecpt checkpoint
Holy shit Guys , i want everyone to see this retweet as much as you can to get this to mainstream , i dont ask for this normally
All apps work , apple animation , minimize , tools , browser , and everything literally this is the best we can
— Chetaslua (@chetaslua)
10:40 PM • Oct 13, 2025
Let’s wait and see…
From our Partners
The Game is Changing
The internet was supposed to make it easier to build and connect. Somewhere along the way, we lost the plot.
beehiiv is changing that once and for all.
On November 13, they’re unveiling what’s next at their first-ever Winter Release Event. For the people shaping the future of content, community, and media, this is an event you can’t miss.
Microsoft MAI-Image-1: The New AI Image Star

Microsoft has built its own AI image model and it’s already in the top 10 globally.
It focuses on photorealism and fast rendering, and it might soon replace DALL-E in Bing and Copilot.
🔍 Key Points:
MAI-Image-1 debuted on 13 Oct 2025.
Built fully in-house by Microsoft no OpenAI tech used.
Already ranks 9th on the LMArena global leaderboard.
Designed with creative pros to avoid generic or repetitive styles.
Faster than larger models built for speed and quality.
📰 What’s New?
MAI-Image-1 is Microsoft’s first text-to-image model built entirely in-house. It produces sharp, photorealistic visuals and is tuned using feedback from artists and designers. On LMArena, it scored over 1,000 votes, placing ahead of some DALL-E and Stable Diffusion versions.
🚨 Why It Matters:
Microsoft is becoming less dependent on OpenAI for core AI tech.
Artists helped design it so the results are fresh, not formulaic.
It's already outperforming some industry benchmarks.
Microsoft plans to put it into Bing Image Creator and Copilot apps very soon.
⏭️ What’s Next?
Expect MAI-Image-1 to appear in Copilot and Bing products. Microsoft is also considering offering it through Azure. Feedback from users on LMArena is still shaping the final version.
🔥 OpenAI + Broadcom: Chips Without Nvidia?

OpenAI is teaming up with Broadcom to make its own AI chips.
These custom processors won’t use Nvidia’s tech a huge shift in the AI arms race.
🔍 Bullet Points:
OpenAI will build 10 GW of custom chips with Broadcom by 2029.
Chips will be designed by OpenAI, manufactured by Broadcom.
No Nvidia hardware the system uses Ethernet, not InfiniBand.
Move helps reduce reliance on Nvidia’s expensive GPUs.
But analysts say Nvidia will still dominate high-end AI hardware.
📰 What’s New?
On 13 Oct 2025, OpenAI announced this bold move to create its own AI chip stack. The chips are designed for AI-specific workloads and will power massive data centers over the next 4 years. Broadcom’s CEO called it “pivotal” for the future of AI.
🚨 Why It Matters:
10 GW = power for 8 million US homes. Huge scale.
Could cost $350 billion+ to deploy this is not a side project.
OpenAI is diversifying also working with AMD and still heavily tied to Nvidia.
Custom chips let them bake their models directly into hardware for efficiency.
⏭️ What’s Next?
Deployment starts in 2026. These chips could give OpenAI tighter control over performance and cost. But Nvidia isn’t going anywhere it still supplies hardware for OpenAI’s biggest models.
🇮🇳 Google’s $15B AI Hub in Visakhapatnam

Google just announced its biggest-ever project in India a $15 billion AI hub in Vizag.
It’ll include a giant 1 GW data center, solar power, subsea cables, and 1.8 lakh jobs.
🔍 Key Points:
$15 billion investment from 2026–2030.
India’s largest AI hub outside the U.S.
1.8 lakh jobs projected in AI City Vizag.
Subsea cable gateway connects India to global AI infrastructure.
Clean energy partnerships with Adani and Airtel.
📰 What’s New?
Announced at Bharat AI Shakti Summit on 14 Oct 2025, the project includes a massive data center, clean-energy plants, new fiber networks, and global data routing through Vizag.
🚨 Why It Matters:
Boosts India’s AI infrastructure and digital economy.
Creates lakhs of jobs and drives Andhra Pradesh’s GSDP.
Reduces dependency on foreign AI clouds supports local data laws.
Strengthens India–US tech ties during trade tensions.
⏭️ What’s Next?
Construction begins in 2026. Expect fast-tracked clearances and new startups around the Vizag hub. Google will also host its Gemini, Veo, and Imagine models on-site, bringing global AI power to Indian soil.
Ithrollu innathe AI Update.
appo adutha l8ril varam.. bie.
Innathe L8R engane ondarunnu? |
Join Founder’s Clone Batch 3 - here

